Gold results22 Jan 2021 13:32
just going back over this these results are simply stunning :
FIRST PASS HIGH-GRADE DRILLING RESULTS AT ZARANOU
First-pass AC & RC exploration programme; 15,000m combined AC & RC
8km strike drill tested
High-grade drilling results incl:
6m @ 15.11g/t from 26m
22m @ 3.39g/t from 8m
2m @ 23g/t from 40m
6m @ 6.72g/t from surface
6m @ 6.44g/t from 132m
6m @ 3.81g/t from 52m
4m @ 5.16g/t from 110m
• Rock chips including 69.9g/t, 48.8g/t & 25.3g/t Au
zara map 2.PNG
SECOND PHASE DRILLING COMPLETED AT ZARANOU
Second Phase drilling: 22,000m combined AC & RC •
High-grade drilling results including:
5m @ 270.7g/t from 4m
24m @ 13.59g/t from 136m
4m @ 25.8g/t from 4m
12m @ 6.59g/t from 52m
4m @ 16.8g/t from 56m
5m @ 11.4g/t from 38m
12m @ 2.65g/t from 32m
16m @ 1.87g/t from 48m
Mineralisation continuity confirmed over multiple targets up to 1.4km long at the Ehuasso Main target
Phase 1 and 2 overview greater than 5gxm_incl legend.jpg
MULTIPLE LARGE SCALE TARGETS DEFINED
47km strike gold corridor defined
16km strike of hard -rock artisanal workings
Only 8km strike drill tested to date
Open in both directions
Historical drill collars located within south -west of license area