Gordon Stein, CFO of CleanTech Lithium, explains why CTL acquired the 23 Laguna Verde licenses. Watch the video here.
https://jmp.sh/sRY0wP7 link to document grom below. hope that helps!
king5hott i thought they had 60 days to file and the possibility of a 30 day extension. that would however been the middle of last month.
im sure stokey12 posted something a while back with a link that stated the 10th of December was a definitive date for either a settlement or go to court.
what would be a good result from the assay results for grams per tonne? looking at that old Rns showing 2/300 grams per tonne that loudspeaker posted earilier is that realistic from this batch?
even at a more consevative 50 grams per tonne x 36 tonnes equals 70 odd ounces or £140k
link direct to post below
https://www.peelenvironmental.co.uk/news-blog/2020/9/1/20m-plastic-to-hydrogen-plant-at-peel-lampps-protos-moves-forward
lm like the money calm bull with this investment of a life time!
GLA
meeting minutes out from northfork.
https://drive.google.com/file/d/1DcuVbBttfJymexF4NyBHErznvCBvDmed/view
Equipment is now in LA and will delivered to site this week.
Lets hope the Aries BS can get sorted and we can crack on!
GLA
this just popped up on my in case you missed it google tiles. yes its 9 months old but and interesting read about W2T
https://www.nspackaging.com/analysis/waste2tricity-plastic-hydrogen/
also shows the demo unit.
link if interested
https://docs.google.com/document/u/0/d/1cWMx3Go2s4STOg92ESQAKKa5DdLeEbTk8lL42uUE6B0/mobilebasic
https://twitter.com/eqtec/status/1291660470244392960
this one