RE: Update31 Aug 2021 17:19
I've watch the podcast with the 3D modelling, over and over and I can't see an obvious drill hole testing the length of the anomalies identified by the IP survey. That said, it is very hard to tell because of the colours used and because they don't give us a full 360 degree spin to get a better idea of the angle and direction of those red lines.
If the drill holes are testing intersection along strike, at (let's say) an angle of 55 degrees, then the holes would be approximately 800m before reaching a depth of 655m i.e. roughly where the mineralisation/open pit will end. That could take 13 days to drill. A 7am RNS in the morning maybe?