RE: Flow Rates30 Jul 2019 09:55
SEA7, where does it say intentionally restricted in the RNS? Varying choke sizes have been tied, yet apparently the smallest one we could use was 1/4 to avoid the well collapsing, so why now use varying chokes?
Testing as 1000 bodp on a 1/4 choke, so, why couldn’t we stick with 1/4 choke, and send to production? Nothing makes sense here from PH.
The 1200 barrels of fluid lost was during drilling and completion, so why wasn’t the water content mentioned during the testing phase? Didn’t suddenly appear imo
I’m not saying I’m correct, and I’m far from an expert in oil, but there are too many contradictions at this stage which is why PH needs to clarify these to settle peoples nerves
He was quick enough on the PR when they needed £12mil!