RE: Elgood28 Dec 2022 14:09
From my little knowledge, I understand that if two fields have been shut-in for a period of time, the pressure built-up can be different. As Blythe is larger, elgood has to wait until the pressure drop in Blythe allows its gas to follow into the pipeline. Then downhole pressure at elgood will drop faster, hence, the need to cycle production from Elgood to sustain prodution. So I'm in line with your comment. I hope to see some production from Elgood in the next RNS, with higher condensate and less water than 100% production from Blythe, but I might be wrong.