RE: Excellent results from valkor12 Jun 2024 12:59
This is interesting.
The heating process for the well was previously 4 weeks heating and 4 week to soak be for production .
Looks like they got it down to two weeks,
A downhole-heater was installed in the HSO 2-4 well the heating process began on June 3, 2024, with production expected to begin later this week. The HSO 8-4 is currently waiting for a second downhole-heater to be delivered and is expected to be installed on or before June 15, 2024