RE: Re-rate21 Feb 2025 09:12
In theory if the Ore is consistent and dissolves at constant rates, at 48,000 tonnes stacked per month, you'd only need circa 0 65 g/t to hit 1,000 Troy Ounces per month production, based on all technical drill and feasibility data we have, they should cake walk this in the next few months, at 1.3 g/t and so on its doubled production, all things being equal.
But this is mining and not all things are ever equal. Ores are typically inconsistent because that's just geology, and you need to play about / commission the plant and acids, etc. to get the optimal run rates.
But considering what we need to hit 1,000 Troy Ounces per month is such a little grade, this should have multiples to run if you are patient and the next 3, 6, 12 months should be transformative IMO.