RE: Schlum rustavelli28 Nov 2020 09:22
In the case of temporary accommodation for staff and required Arranging infrastructure.
Harmful to the ambient air is expected during the construction works Dispersion of substances and noise of construction equipment. During construction The source of impact on the atmospheric air is construction equipment Exhaust emitted by engine operation and when moving equipment Generated dust. In the vicinity of the project area, it is planned "Tbilisi-Implementation of "Bakurtsikhe" highway reconstruction project, which led to May be Cause Cumulative Impact Atmospheric In the air In terms of impact. During operation in ambient air Spills of harmful substances are expected between the pipe clamps Existing gas output and noise generation of the gas processor During the operation of the station.
During the earthworks, the soil will be removed and stored In accordance with the legislation of Georgia.
According to the screening statement will be generated at the stage of construction of the pipeline Hazardous and non-hazardous waste, while waste during the operation phase Emergence is not expected. Waste will occur in the project area Separate collection. Hazardous waste is transferred to this type of waste An organization with appropriate authority to manage. Land works During the execution it is expected to form a soil, which will be managed and placed Must be done in compliance with the relevant conditions.
Depending on the specifics of the activity, there is a large-scale accident and / or Some risk of disaster. Safety at railway crossing points The purpose is to make a hose and a spark plug.In case of pressure drop in the gas pipeline, the gas supply will be automatic Lock.
Pneumatic or hydraulic will be used during the pipeline test Method. In the case of hydraulic testing, surface water will occur Taking water from facilities. The pipeline crosses ravines and reclamation canals;Resulting in a risk of contamination of surface water bodies.
Due to the specifics of the activity there is a cultural heritage Probability of discovery / impact on monuments. Archaeological site discovery In this case, the Law of Georgia on Cultural Heritage will be implemented Carrying out the measures provided.
The project corridor of the pipeline will pass over the Iori plateau, where it is presented Steppe, forest-steppe, arid forest and semi-desert-like type Landscapes. Given the length of the gas pipeline (20.6 km.), There is Risk of vegetation impact. With this the gas pipeline is certain The section will pass along the settlement, crossing the agricultural Destination plots, dirt and asphalt roads, railway line,Various purpose pipelines, communication lines, as well as several