RE: How to ramp up to T212 Aug 2021 21:56
Indeed it is an excellent point Kev. The utilisation was in the 90% world which is good over 5 day periods. However, there was no mention of availability, they are not the same thing. The utilisation can be expressed as the time that the equipment was used as part of the time that it was available to be used. So if in reality the available time the equipment could have been used over five days came out to say 3 days ( but over a 5 day timescale) then operational time s 90% of 3 days not 5 ( albeit a 5 day week was in operation) . The two days worth of non available time could have been spent on start ups, on off lag time, adjustments, training, tuning etc. So if 5 day working was only actually 3 days available and then at 90 % there would not have been much stuff actually processed ie the ROM wouldn’t have been that much, having said that I don’t really know, but full comissioning and reaching design output usually takes time. The 90 % utilisation does not mean tha5 it was 90 of 5 days.
Anyway had a cracking day. With the roof open on me roadster, South Downs, Birling Gap, nice walk, fish and chips in Eastbourne, nice drive home. I like a nice day. Looking at the view from the cliffs, although in a transindental moment, I thought production increasing and price increasing mmmmmm. Couldn’t help meself.