RE: Seadrill RNS?9 Dec 2019 08:57
The signing of the sea drill contract and the particulars of the drill ship are IMO separate so will not holdup the EA process.
'A major part of the work being undertaken by Acorn pertains to incorporating into the EA documentation detailed data unique and specific to the actual rig, that will undertake the planned drilling activity. Substantial elements of the document submitted in April 2018 contained, of necessity, only generalised data of a "hypothetical rig" that could be utilised to carry out the drilling operations. However, now that BPC is working with Seadrill, specific data from the rig that will be mobilised to the field is available and can be included as part of the application update. This data includes, in particular, technical details, equipment lists, standard operating procedures, and response plans specific to that rig.'