Our latest Investing Matters Podcast episode with QuotedData's Edward Marten has just been released. Listen here.
Good morning chaps …
Here we go with your 3-6 posts '1 month old dodge account' you won't last long here, believe me.... Spreading FUD - fear uncertainty and doubt - over the bulk underground, because that's essentially the only unknown left that such disingenuous posts can target.
Last year we had months and months of tecnhical FUD with the GreenTool and others - who said Havieron would never be economic... but here we are 12 months later with a gigantic starter deposit, a $50m decline going in, and $50m GGP cash funding to DFS, and a published phase 1 mine PFS to take to the bank ... so NCM can get ore to Telfer ASAP.
You may be able to confuse and scare the un-researched with your manipulation, but you cannot touch Bamps or me.
For the rest of you MrBig is a skilled and devious operator who last night was attempting to exploit an ostensibly clever argument. The posts were subsequently removed this am. For the correct reasons.
What he/she was trying to do last night was apply NCM's conservative, underground stoping phase 1 mine operational costs @ $84/tonne - actually $81/tonne according to GGP using the correct exchange rate to Bulk Underground production.
The first Stoping operation has naturally has lower volumes, due to the inherent volume limitations of the Stoping technique and higher costs - ore transport to surface limitation, requirement for drill and blast / explosives, and extra material handling, and subsequence labour in back pasting costs )
But you cannot apply this to the anticipated Bulk under ground block caving grades of the larger scale deposit where the cost per tonne would be circa $25-27/tonne
This is a totally and fundamentally inappropriate comparison made by BiggL - It's like comparing two completely different company cost structures, AND specifically designed to imply that anything under 1.5g is likely to be 'uneconomic'...
And It's total BS becuase we ALL know that Cadia is economic down to 0.4g/t Au... specifically due the bulk efficiencies of the operational costs.
And very much like comparing and interweaving the cost structure of building Ferraris directly to Ford Fiestas -
IE both make massive profits, BUT in TOTALLY different ways . Obviously You cannot make a profit building Ford fiestas in the way you build a Ferrari though. That would be loss making.
That's the best analogy I can come up with. And that is the tactic of this poster. Always Happy to smash them into touch.
Expect Multiple shorter accounts with a very obvious agenda.s
Regarding bulk underground : The only question is will this be a block cave or a more selective sub level cave...? Anyone with mining nouse can see that.. The grade in those breccia are nothing short of sensational. And a mine in their own right.
Here we go with your 3-6 posts '1 month old dodge account' you won't last long here, believe me.... Spreading FUD - fear uncertainty and doubt - over the bulk underground, because that's essentially the only unknown left that such disingenuous posts can target.
Last year we had months and months of tecnhical FUD with the GreenTool and others - who said Havieron would never be economic... but here we are 12 months later with a gigantic starter deposit, a $50m decline going in, and $50m GGP cash funding to DFS, and a published phase 1 mine PFS to take to the bank ... so NCM can get ore to Telfer ASAP.
You may be able to confuse and scare the un-researched with your manipulation, but you cannot touch Bamps or me.
For the rest of you MrBig is a skilled and devious operator who last night was attempting to exploit an ostensibly clever argument. The posts were subsequently removed this am. For the correct reasons.
What he/she was trying to do last night was apply NCM's conservative, underground stoping phase 1 mine operational costs @ $84/tonne - actually $81/tonne according to GGP using the correct exchange rate to Bulk Underground production.
The first Stoping operation has naturally has lower volumes, due to the inherent volume limitations of the Stoping technique and higher costs - ore transport to surface limitation, requirement for drill and blast / explosives, and extra material handling, and subsequence labour in back pasting costs )
But you cannot apply this to the anticipated Bulk under ground block caving grades of the larger scale deposit where the cost per tonne would be circa $25-27/tonne
This is a totally and fundamentally inappropriate comparison made by BiggL - It's like comparing two completely different company cost structures, AND specifically designed to imply that anything under 1.5g is likely to be 'uneconomic'...
And It's total BS becuase we ALL know that Cadia is economic down to 0.4g/t Au... specifically due the bulk efficiencies of the operational costs.
And very much like comparing and interweaving the cost structure of building Ferraris directly to Ford Fiestas -
IE both make massive profits, BUT in TOTALLY different ways . Obviously You cannot make a profit building Ford fiestas in the way you build a Ferrari though. That would be loss making.
That's the best analogy I can come up with. And that is the tactic of this poster. Always Happy to smash them into touch.
Expect Multiple shorter accounts with a very obvious agenda.s
Regarding bulk underground : The only question is will this be a block cave or a more selective sub level cave...? Anyone with mining nouse can see that.. The grade in those breccia are nothing short of sensational. And a mine in their own right.
Here we go with your 3-6 posts '1 month old dodge account' you won't last long here, believe me.... Spreading FUD - fear uncertainty and doubt - over the bulk underground, because that's essentially the only unknown left that such disingenuous posts can target.
Last year we had months and months of tecnhical FUD with the GreenTool and others - who said Havieron would never be economic... but here we are 12 months later with a gigantic starter deposit, a $50m decline going in, and $50m GGP cash funding to DFS, and a published phase 1 mine PFS to take to the bank ... so NCM can get ore to Telfer ASAP.
You may be able to confuse and scare the un-researched with your manipulation, but you cannot touch Bamps or me.
For the rest of you MrBig is a skilled and devious operator who last night was attempting to exploit an ostensibly clever argument. The posts were subsequently removed this am. For the correct reasons.
What he/she was trying to do last night was apply NCM's conservative, underground stoping phase 1 mine operational costs @ $84/tonne - actually $81/tonne according to GGP using the correct exchange rate to Bulk Underground production.
The first Stoping operation has naturally has lower volumes, due to the inherent volume limitations of the Stoping technique and higher costs - ore transport to surface limitation, requirement for drill and blast / explosives, and extra material handling, and subsequence labour in back pasting costs )
But you cannot apply this to the anticipated Bulk under ground block caving grades of the larger scale deposit where the cost per tonne would be circa $25-27/tonne
This is a totally and fundamentally inappropriate comparison made by BiggL - It's like comparing two completely different company cost structures, AND specifically designed to imply that anything under 1.5g is likely to be 'uneconomic'...
And It's total BS becuase we ALL know that Cadia is economic down to 0.4g/t Au... specifically due the bulk efficiencies of the operational costs.
And very much like comparing and interweaving the cost structure of building Ferraris directly to Ford Fiestas -
IE both make massive profits, BUT in TOTALLY different ways . Obviously You cannot make a profit building Ford fiestas in the way you build a Ferrari though. That would be loss making.
That's the best analogy I can come up with. And that is the tactic of this poster. Always Happy to smash them into touch.
Expect Multiple shorter accounts with a very obvious agenda.s
Regarding bulk underground : The only question is will this be a block cave or a more selective sub level cave...? Anyone with mining nouse can see that.. The grade in those breccia are nothing short of sensational. And a mine in their own right.
Here we go with your 3-6 posts '1 month old dodge account' you won't last long here, believe me.... Spreading FUD - fear uncertainty and doubt - over the bulk underground, because that's essentially the only unknown left that such disingenuous posts can target.
Last year we had months and months of tecnhical FUD with the GreenTool and others - who said Havieron would never be economic... but here we are 12 months later with a gigantic starter deposit, a $50m decline going in, and $50m GGP cash funding to DFS, and a published phase 1 mine PFS to take to the bank ... so NCM can get ore to Telfer ASAP.
You may be able to confuse and scare the un-researched with your manipulation, but you cannot touch Bamps or me.
For the rest of you MrBig is a skilled and devious operator who last night was attempting to exploit an ostensibly clever argument. The posts were subsequently removed this am. For the correct reasons.
What he/she was trying to do last night was apply NCM's conservative, underground stoping phase 1 mine operational costs @ $84/tonne - actually $81/tonne according to GGP using the correct exchange rate to Bulk Underground production.
The first Stoping operation has naturally has lower volumes, due to the inherent volume limitations of the Stoping technique and higher costs - ore transport to surface limitation, requirement for drill and blast / explosives, and extra material handling, and subsequence labour in back pasting costs )
But you cannot apply this to the anticipated Bulk under ground block caving grades of the larger scale deposit where the cost per tonne would be circa $25-27/tonne
This is a totally and fundamentally inappropriate comparison made by BiggL - It's like comparing two completely different company cost structures, AND specifically designed to imply that anything under 1.5g is likely to be 'uneconomic'...
And It's total BS becuase we ALL know that Cadia is economic down to 0.4g/t Au... specifically due the bulk efficiencies of the operational costs.
And very much like comparing and interweaving the cost structure of building Ferraris directly to Ford Fiestas -
IE both make massive profits, BUT in TOTALLY different ways . Obviously You cannot make a profit building Ford fiestas in the way you build a Ferrari though. That would be loss making.
That's the best analogy I can come up with. And that is the tactic of this poster. Always Happy to smash them into touch.
Expect Multiple shorter accounts with a very obvious agenda.s
Regarding bulk underground : The only question is will this be a block cave or a more selective sub level cave...? Anyone with mining nouse can see that.. The grade in those breccia are nothing short of sensational. And a mine in their own right.
Here we go with your 3-6 posts '1 month old dodge account' you won't last long here, believe me.... Spreading FUD - fear uncertainty and doubt - over the bulk underground, because that's essentially the only unknown left that such disingenuous posts can target.
Last year we had months and months of tecnhical FUD with the GreenTool and others - who said Havieron would never be economic... but here we are 12 months later with a gigantic starter deposit, a $50m decline going in, and $50m GGP cash funding to DFS, and a published phase 1 mine PFS to take to the bank ... so NCM can get ore to Telfer ASAP.
You may be able to confuse and scare the un-researched with your manipulation, but you cannot touch Bamps or me.
For the rest of you MrBig is a skilled and devious operator who last night was attempting to exploit an ostensibly clever argument. The posts were subsequently removed this am. For the correct reasons.
What he/she was trying to do last night was apply NCM's conservative, underground stoping phase 1 mine operational costs @ $84/tonne - actually $81/tonne according to GGP using the correct exchange rate to Bulk Underground production.
The first Stoping operation has naturally has lower volumes, due to the inherent volume limitations of the Stoping technique and higher costs - ore transport to surface limitation, requirement for drill and blast / explosives, and extra material handling, and subsequence labour in back pasting costs )
But you cannot apply this to the anticipated Bulk under ground block caving grades of the larger scale deposit where the cost per tonne would be circa $25-27/tonne
This is a totally and fundamentally inappropriate comparison made by BiggL - It's like comparing two completely different company cost structures, AND specifically designed to imply that anything under 1.5g is likely to be 'uneconomic'...
And It's total BS becuase we ALL know that Cadia is economic down to 0.4g/t Au... specifically due the bulk efficiencies of the operational costs.
And very much like comparing and interweaving the cost structure of building Ferraris directly to Ford Fiestas -
IE both make massive profits, BUT in TOTALLY different ways . Obviously You cannot make a profit building Ford fiestas in the way you build a Ferrari though. That would be loss making.
That's the best analogy I can come up with. And that is the tactic of this poster. Always Happy to smash them into touch.
Expect Multiple shorter accounts with a very obvious agenda.s
Regarding bulk underground : The only question is will this be a block cave or a more selective sub level cave...? Anyone with mining nouse can see that.. The grade in those breccia are nothing short of sensational. And a mine in their own right.
Here we go with your 3-6 posts '1 month old dodge account' you won't last long here, believe me.... Spreading FUD - fear uncertainty and doubt - over the bulk underground, because that's essentially the only unknown left that such disingenuous posts can target.
Last year we had months and months of tecnhical FUD with the GreenTool and others - who said Havieron would never be economic... but here we are 12 months later with a gigantic starter deposit, a $50m decline going in, and $50m GGP cash funding to DFS, and a published phase 1 mine PFS to take to the bank ... so NCM can get ore to Telfer ASAP.
You may be able to confuse and scare the un-researched with your manipulation, but you cannot touch Bamps or me.
For the rest of you MrBig is a skilled and devious operator who last night was attempting to exploit an ostensibly clever argument. The posts were subsequently removed this am. For the correct reasons.
What he/she was trying to do last night was apply NCM's conservative, underground stoping phase 1 mine operational costs @ $84/tonne - actually $81/tonne according to GGP using the correct exchange rate to Bulk Underground production.
The first Stoping operation has naturally has lower volumes, due to the inherent volume limitations of the Stoping technique and higher costs - ore transport to surface limitation, requirement for drill and blast / explosives, and extra material handling, and subsequence labour in back pasting costs )
But you cannot apply this to the anticipated Bulk under ground block caving grades of the larger scale deposit where the cost per tonne would be circa $25-27/tonne
This is a totally and fundamentally inappropriate comparison made by BiggL - It's like comparing two completely different company cost structures, AND specifically designed to imply that anything under 1.5g is likely to be 'uneconomic'...
And It's total BS becuase we ALL know that Cadia is economic down to 0.4g/t Au... specifically due the bulk efficiencies of the operational costs.
And very much like comparing and interweaving the cost structure of building Ferraris directly to Ford Fiestas -
IE both make massive profits, BUT in TOTALLY different ways . Obviously You cannot make a profit building Ford fiestas in the way you build a Ferrari though. That would be loss making.
That's the best analogy I can come up with. And that is the tactic of this poster. Always Happy to smash them into touch.
Expect Multiple shorter accounts with a very obvious agenda.s
Regarding bulk underground : The only question is will this be a block cave or a more selective sub level cave...? Anyone with mining nouse can see that.. The grade in those breccia are nothing short of sensational. And a mine in their own right.
They huddled together for warmth despite sunny skies above. It was nothing to do with Bottles mum though ….
Here we go with your 3-6 posts '1 month old dodge account' you won't last long here, believe me.... Spreading FUD - fear uncertainty and doubt - over the bulk underground, because that's essentially the only unknown left that such disingenuous posts can target.
Last year we had months and months of tecnhical FUD with the GreenTool and others - who said Havieron would never be economic... but here we are 12 months later with a gigantic starter deposit, a $50m decline going in, and $50m GGP cash funding to DFS, and a published phase 1 mine PFS to take to the bank ... so NCM can get ore to Telfer ASAP.
You may be able to confuse and scare the un-researched with your manipulation, but you cannot touch Bamps or me.
For the rest of you MrBig is a skilled and devious operator who last night was attempting to exploit an ostensibly clever argument. The posts were subsequently removed this am. For the correct reasons.
What he/she was trying to do last night was apply NCM's conservative, underground stoping phase 1 mine operational costs @ $84/tonne - actually $81/tonne according to GGP using the correct exchange rate to Bulk Underground production.
The first Stoping operation has naturally has lower volumes, due to the inherent volume limitations of the Stoping technique and higher costs - ore transport to surface limitation, requirement for drill and blast / explosives, and extra material handling, and subsequence labour in back pasting costs )
But you cannot apply this to the anticipated Bulk under ground block caving grades of the larger scale deposit where the cost per tonne would be circa $25-27/tonne
This is a totally and fundamentally inappropriate comparison made by BiggL - It's like comparing two completely different company cost structures, AND specifically designed to imply that anything under 1.5g is likely to be 'uneconomic'...
And It's total BS becuase we ALL know that Cadia is economic down to 0.4g/t Au... specifically due the bulk efficiencies of the operational costs.
And very much like comparing and interweaving the cost structure of building Ferraris directly to Ford Fiestas -
IE both make massive profits, BUT in TOTALLY different ways . Obviously You cannot make a profit building Ford fiestas in the way you build a Ferrari though. That would be loss making.
That's the best analogy I can come up with. And that is the tactic of this poster. Always Happy to smash them into touch.
Expect Multiple shorter accounts with a very obvious agenda.s
Regarding bulk underground : The only question is will this be a block cave or a more selective sub level cave...? Anyone with mining nouse can see that.. The grade in those breccia are nothing short of sensational. And a mine in their own right.
Here we go with your 3-6 posts '1 month old dodge account' you won't last long here, believe me.... Spreading FUD - fear uncertainty and doubt - over the bulk underground, because that's essentially the only unknown left that such disingenuous posts can target.
Last year we had months and months of tecnhical FUD with the GreenTool and others - who said Havieron would never be economic... but here we are 12 months later with a gigantic starter deposit, a $50m decline going in, and $50m GGP cash funding to DFS, and a published phase 1 mine PFS to take to the bank ... so NCM can get ore to Telfer ASAP.
You may be able to confuse and scare the un-researched with your manipulation, but you cannot touch Bamps or me.
For the rest of you MrBig is a skilled and devious operator who last night was attempting to exploit an ostensibly clever argument. The posts were subsequently removed this am. For the correct reasons.
What he/she was trying to do last night was apply NCM's conservative, underground stoping phase 1 mine operational costs @ $84/tonne - actually $81/tonne according to GGP using the correct exchange rate to Bulk Underground production.
The first Stoping operation has naturally has lower volumes, due to the inherent volume limitations of the Stoping technique and higher costs - ore transport to surface limitation, requirement for drill and blast / explosives, and extra material handling, and subsequence labour in back pasting costs )
But you cannot apply this to the anticipated Bulk under ground block caving grades of the larger scale deposit where the cost per tonne would be circa $25-27/tonne
This is a totally and fundamentally inappropriate comparison made by BiggL - It's like comparing two completely different company cost structures, AND specifically designed to imply that anything under 1.5g is likely to be 'uneconomic'...
And It's total BS becuase we ALL know that Cadia is economic down to 0.4g/t Au... specifically due the bulk efficiencies of the operational costs.
And very much like comparing and interweaving the cost structure of building Ferraris directly to Ford Fiestas -
IE both make massive profits, BUT in TOTALLY different ways . Obviously You cannot make a profit building Ford fiestas in the way you build a Ferrari though. That would be loss making.
That's the best analogy I can come up with. And that is the tactic of this poster. Always Happy to smash them into touch.
Expect Multiple shorter accounts with a very obvious agenda.s
Regarding bulk underground : The only question is will this be a block cave or a more selective sub level cave...? Anyone with mining nouse can see that.. The grade in those breccia are nothing short of sensational. And a mine in their own right.
And another cyclist! Had a bit of a conversation about this on the Argo telegram page recently. Few people got a little marry as the pictures of our bikes went up ;)
Road for me, some Zwift as well (Harry Palmer Llama Farmer)
Hello!
I read/watched this board for a long time, but haven’t posted in a while.
I initially bought in at 43p, selling at 69p before buying back in at 53p and enjoying the increase to £1/£20.
Just wanted to congratulate everyone that held firm and benefitted from the increase. This place was compulsive reading, not always for the right reasons though! It had its “characters”, but eventually even the entertainment value vanished!
Seems a happier ship now and perhaps I’ll stop by a little more ;)
Well done and good luck all!