RE: RNS - pdf version7 Jun 2021 08:06
From these tables it can be seen that, at the grades stated, the minimum Exploration
Target of 70Mt of material would, if verified, equate to a further 3Mt of contained
ilmenite and the maximum Exploration Target of 300Mt of material would, if verified,
equate to a further 33Mt of contained ilmenite.
Even at the lower end of the Exploration Target range, therefore, if proven up by
subsequent drilling this would result in a significant uplift in the current contained
ilmenite of 1.7Mt per the existing maiden Mineral Resource Estimate for the Project,
with the result that the contained ilmenite would increase to 4.7Mt in total.