RE: What is AB doing?10 Jun 2025 21:15
Point 2 at 18:10 seems to be a conflation all equipment including whaever was referred to in Chairman's statement of annual report 13/12/24 with negative implication via scornful conflation.
The above does not refute the cohesion between RNS' of 06/11/24, 18/11/24, 13/12/24 and 31/03/25. The specific start up, test production equipment referred to in 06/11/24 was paid for according to that RNS it was in Ougadougou as per 18/11/24 and I presume it was or was some of the equipment that was on site according to Chairman's statement 13/12/24 where minimum licence conditions were fulfilled to maintain the licencse (parahrased interpretation from nemory).
The 06/11/24 RNS referred to six months spares - equipment which was to arrive in middle of january (2025) it is possible that tha is the equimpent which is referred to as bein in customs - half year report - Charmans statement as per 31/03/25. Even if all of tbe equipment was in customs, that would not necessarily refute the earlier charman"s statement of 13/12/24.
Had there been an update in Aoril, that could perhaps have been clarified, maybe it will be clarified this summer, if not, maybe during an Australian summer. : ) š»