RE: Accretive Time Line2 Feb 2023 07:49
FingerX, you are correct, it doesn't say replace, nor does it imply replace, nor does it even reference SMS our existing engineering designers. Nor does it say we are doubling or even tripling down on the responsibilities of the DFS (and that doesn't even include EMH).
And that is exactly my point.....at this stage we need complete transparency of who, why, when, what for. Before, the selling point was existing tech, min risk. Now not sure?