RE: Shinybits posts overnight worth sharing4 Sep 2024 06:37
“”The power station has had all its high voltage terminations reterminated from scratch. Tails thickener basically rebuilt, copper thickener rebuilt, mills refined with new wear plates, lube systems overhauled, chillers got a great deal of love, gold room infrastructure replaced, stacker 2 mechanically rebuilt, the list goes on. Some of the things are in themselves not ridiculously expensive, but the down time required to facilitate them would be. Eg the power station repairs, a bit over a week running just on the old diesel backup station from original Telfer plant. Just couldn’t do that under normal circumstances.””