RE: Naheed needs to go14 Aug 2025 14:17
Very true Beaub but as said , she just needs to pull her sloggi's up and one over the line, as its always about achievable MC , never sp and for multi billion projects, ORCP still has a long way to fly, if she does.
Some shares (unless consolidated) never ever come close to previous sp's (hence the unresearched cries on many boards "this use to be Xp) the one thing they all have in common, is with genuine PROGRESS, all will exceed previous MC highs.
Achievable MC , divided by full share base = potential sp
So if she gets one over the line, multi billion projects Pakistan, do you thinks orcp will be worth an MC of 20m , £50m , £250m, £500m, back in the day the original power station LOI was £3.5 billion, with a 30 year life cycle of around $90 BILLION, making orcp's 12.5% option worth $8.5 Billion over time, nobody expected them to stick around, once going operational expected to cash in.......
The outside Pakistan projects are a distraction , might add some nice moves BUT its the mega projects that will reap the big rewards.........GLA