RE: TL Energy Forum8 Sep 2025 11:52
Sunda Energyβs role in supporting Timor-Lesteβs long-term energy security.
Finally, I have said this for 4 years, be it the single string Gas/LNG planned for Beaco , then Metinaro and now Natarbora, have always said , TL plan to use Chuditch for their domestic supply plan, which even 4 years ago was down as conversion of 3 power plants to LNG/Gas ASAP by 2026 hopefully (PM Rauk speech) while at the same time stating latest tenders for Greater Sunrise 2030, 4 years later..........
The original Beaco plan was all 1 import gas/lng and upto 4 gas/lng export strings, now all going to Natarbora, the Domestic import string was removed from Beaco and studies done for Metinaro near Dili (stopped being reported on) The plan was for it to be built independently at the same location, for domestic supply and years before GS saw any production.........
That line reinforces , the same plan can no move on swiftly, once Chuditch drilled - pipe Bayu- pipe Natarbora
Loving that line Filthy, as said for 4 years , Chuditch the only game in town for their Domestic security plans, laid out in 2021 by PM Rauk.