RE: Spud 3rd Oct?30 Sep 2020 11:27
Hi Rovers66. In RBD’s 22 Sept RNS it said “drill the main borehole to a depth of approximately 2,000 metres. Completion is expected to take six to ten weeks” and I wondered why it would take so long. Perhaps a four week contingency has been included for unexpected results, I thought, or maybe for a well test. So I had another look at the latest presentation on the RBD website - which I think is dated February '20. It certainly shows B-1 as a vertical well, and B-2 as a horizontal well restricted to the Kirkham Abbey Formation. Speaking as a former geologist, I have to say that B-2 looks a bit odd for what was meant to be a further appraisal well (if drilled,and it looks more like a development well path to me. So I think this may be an old, somewhat schematic slide from Rathlin. For example, look at how the Cadeby Formation is shown; it certainly isn't drawn very accurately, well not geologically speaking. I also note that UJO no longer includes this slide in their own presentations. So, unless there is a more recent RBD presentation which shows B-2 as a vertical well, I'm inclined to take both the B-1 and B-2 well paths with a pinch of salt. Maybe I’ve got this wrong, so could someone please point me to an RNS where it says that B-1 will be drilled (more or less) vertically? Maybe it’s in a later presentation, but it still doesn't seem to be very clear from recent RNSs.