RE: Annual Report out.7 Oct 2025 11:34
This from the report says it all.
" The internal challenges include the disappointing hold ups at Cambay resulting in continued delay of expected production revenue increases. The hopes associated with the successful Cambay initial 50% farm-out and the $20 million carry of costs by new partner Antelopus Selan Energy Limited (formerly Selan Exploration Technology Limited, and referred to throughout the Annual Report as "Selan") have not materialised to date. Selan is the lead operator, leaving Synergia with limited influence over operational decisions."
Not a bloody word as to how, within the terms of the contract, it was possible for Selan to procrastinate im the way that they did.