RE: Hurricane24 Feb 2021 14:17
Interested to understand how the December $19m was accounted .
Ave load 2020 per month 425,000 boe .
Brent December $50
( $19m / 425,000 = $45 per boe to free cash ) So impossible .
1. Was Dec 2020 load 500,000 not 425,000 ? = $38per boe to free cash . Possible .
2 The $4m Quarterly interest payment , only due Jan 2021 ? Net costs lower Dec 2020 . Possible
3 Both 1 and 2 . combined to produce $19m .
Hurricane Breakeven all inclusive cost between $30- $35 boe .
Therefore 425,000 /$32.5 boe = $14m per load at $65 Brent of free cash .
Not a bean counter so please enlighten my musing's.