RE: Some news31 Jan 2025 14:25
Mr C, the plan was to pump water from the Orange River to the mine, a distance of some 10 or 12km, if memory serves. They applied for and received a license to draw water from the Orange (which is worth something, because apparently the flow of the Orange is limited and these licenses aren't easy to come by) and put out a tender for bids to build the pipeline. As far as I can remember, the pipeline was never built for lack of funds. Someone please correct me if I've got my facts wrong, which has been known to happen. Just ask Mrs gmed. No, on second thought, better not ask her.