H11-12 Assay10 Nov 2021 18:52
Been some time since H11-12 were completed, the info from the visual inspection appears to highlight that these two could yield quite impressive results.
I wonder are the team holding these back until they feel the overhang has cleared or have they directed the assay company to focus on other holes?
19-Aug-2021
· Hole BRDD-21-011 was completed at 673.3m, having intersected 512m of visible copper mineralisation from 110m, including two intervals of stronger mineralisation over 43m and 162m lengths in the main (western) zone and one stronger mineralised interval in the eastern zone over a 49m length.
· Hole BRDD-21-012 was completed at 498.4m after intersecting a 187m interval of visible copper mineralisation from 204m-391m, with a stronger 74m zone of mineralisation intercepted from 204m to 278m.