RE: Production RNS tomorrow and run to 0.68 gap, technical grade then HE1 style run to 1p27 Feb 2024 13:13
Acker, totally agree with you this time.
GR need to demonstrate that Zulu is capable to produce SC6 spodumene on a monthly basis at a minimum of 4,000 tonnes per month. I expect at least 1,000 tonne in March before production can be scaled up in Q2.
If GR cannot demonstrate the above by end of Q2, I would recommend to bail out.
At present, this is his last chance to show us that he can make it work which I think he is desperate to do as GR knows perfectly well that the market doesn't trust him anymore.