Valued between 1.2 to 1.7 b in ground value of 10bill.
This is only the underground doesn't include PGMs in open pit. An IRR of 37%.
NKT is the baby, it is about 10% wait until we get Poaz and Nyud not mentioning the other areas.
10% is worth 10 billion. Enough said.
Here we go with your 3-6 posts '1 month old dodge account' you won't last long here, believe me.... Spreading FUD - fear uncertainty and doubt - over the bulk underground, because that's essentially the only unknown left that such disingenuous posts can target.
Last year we had months and months of tecnhical FUD with the GreenTool and others - who said Havieron would never be economic... but here we are 12 months later with a gigantic starter deposit, a $50m decline going in, and $50m GGP cash funding to DFS, and a published phase 1 mine PFS to take to the bank ... so NCM can get ore to Telfer ASAP.
You may be able to confuse and scare the un-researched with your manipulation, but you cannot touch Bamps or me.
For the rest of you MrBig is a skilled and devious operator who last night was attempting to exploit an ostensibly clever argument. The posts were subsequently removed this am. For the correct reasons.
What he/she was trying to do last night was apply NCM's conservative, underground stoping phase 1 mine operational costs @ $84/tonne - actually $81/tonne according to GGP using the correct exchange rate to Bulk Underground production.
The first Stoping operation has naturally has lower volumes, due to the inherent volume limitations of the Stoping technique and higher costs - ore transport to surface limitation, requirement for drill and blast / explosives, and extra material handling, and subsequence labour in back pasting costs )
But you cannot apply this to the anticipated Bulk under ground block caving grades of the larger scale deposit where the cost per tonne would be circa $25-27/tonne
This is a totally and fundamentally inappropriate comparison made by BiggL - It's like comparing two completely different company cost structures, AND specifically designed to imply that anything under 1.5g is likely to be 'uneconomic'...
And It's total BS becuase we ALL know that Cadia is economic down to 0.4g/t Au... specifically due the bulk efficiencies of the operational costs.
And very much like comparing and interweaving the cost structure of building Ferraris directly to Ford Fiestas -
IE both make massive profits, BUT in TOTALLY different ways . Obviously You cannot make a profit building Ford fiestas in the way you build a Ferrari though. That would be loss making.
That's the best analogy I can come up with. And that is the tactic of this poster. Always Happy to smash them into touch.
Expect Multiple shorter accounts with a very obvious agenda.s
Regarding bulk underground : The only question is will this be a block cave or a more selective sub level cave...? Anyone with mining nouse can see that.. The grade in those breccia are nothing short of sensational. And a mine in their own right.
Here we go with your 3-6 posts '1 month old dodge account' you won't last long here, believe me.... Spreading FUD - fear uncertainty and doubt - over the bulk underground, because that's essentially the only unknown left that such disingenuous posts can target.
Last year we had months and months of tecnhical FUD with the GreenTool and others - who said Havieron would never be economic... but here we are 12 months later with a gigantic starter deposit, a $50m decline going in, and $50m GGP cash funding to DFS, and a published phase 1 mine PFS to take to the bank ... so NCM can get ore to Telfer ASAP.
You may be able to confuse and scare the un-researched with your manipulation, but you cannot touch Bamps or me.
For the rest of you MrBig is a skilled and devious operator who last night was attempting to exploit an ostensibly clever argument. The posts were subsequently removed this am. For the correct reasons.
What he/she was trying to do last night was apply NCM's conservative, underground stoping phase 1 mine operational costs @ $84/tonne - actually $81/tonne according to GGP using the correct exchange rate to Bulk Underground production.
The first Stoping operation has naturally has lower volumes, due to the inherent volume limitations of the Stoping technique and higher costs - ore transport to surface limitation, requirement for drill and blast / explosives, and extra material handling, and subsequence labour in back pasting costs )
But you cannot apply this to the anticipated Bulk under ground block caving grades of the larger scale deposit where the cost per tonne would be circa $25-27/tonne
This is a totally and fundamentally inappropriate comparison made by BiggL - It's like comparing two completely different company cost structures, AND specifically designed to imply that anything under 1.5g is likely to be 'uneconomic'...
And It's total BS becuase we ALL know that Cadia is economic down to 0.4g/t Au... specifically due the bulk efficiencies of the operational costs.
And very much like comparing and interweaving the cost structure of building Ferraris directly to Ford Fiestas -
IE both make massive profits, BUT in TOTALLY different ways . Obviously You cannot make a profit building Ford fiestas in the way you build a Ferrari though. That would be loss making.
That's the best analogy I can come up with. And that is the tactic of this poster. Always Happy to smash them into touch.
Expect Multiple shorter accounts with a very obvious agenda.s
Regarding bulk underground : The only question is will this be a block cave or a more selective sub level cave...? Anyone with mining nouse can see that.. The grade in those breccia are nothing short of sensational. And a mine in their own right.
Here we go with your 3-6 posts '1 month old dodge account' you won't last long here, believe me.... Spreading FUD - fear uncertainty and doubt - over the bulk underground, because that's essentially the only unknown left that such disingenuous posts can target.
Last year we had months and months of tecnhical FUD with the GreenTool and others - who said Havieron would never be economic... but here we are 12 months later with a gigantic starter deposit, a $50m decline going in, and $50m GGP cash funding to DFS, and a published phase 1 mine PFS to take to the bank ... so NCM can get ore to Telfer ASAP.
You may be able to confuse and scare the un-researched with your manipulation, but you cannot touch Bamps or me.
For the rest of you MrBig is a skilled and devious operator who last night was attempting to exploit an ostensibly clever argument. The posts were subsequently removed this am. For the correct reasons.
What he/she was trying to do last night was apply NCM's conservative, underground stoping phase 1 mine operational costs @ $84/tonne - actually $81/tonne according to GGP using the correct exchange rate to Bulk Underground production.
The first Stoping operation has naturally has lower volumes, due to the inherent volume limitations of the Stoping technique and higher costs - ore transport to surface limitation, requirement for drill and blast / explosives, and extra material handling, and subsequence labour in back pasting costs )
But you cannot apply this to the anticipated Bulk under ground block caving grades of the larger scale deposit where the cost per tonne would be circa $25-27/tonne
This is a totally and fundamentally inappropriate comparison made by BiggL - It's like comparing two completely different company cost structures, AND specifically designed to imply that anything under 1.5g is likely to be 'uneconomic'...
And It's total BS becuase we ALL know that Cadia is economic down to 0.4g/t Au... specifically due the bulk efficiencies of the operational costs.
And very much like comparing and interweaving the cost structure of building Ferraris directly to Ford Fiestas -
IE both make massive profits, BUT in TOTALLY different ways . Obviously You cannot make a profit building Ford fiestas in the way you build a Ferrari though. That would be loss making.
That's the best analogy I can come up with. And that is the tactic of this poster. Always Happy to smash them into touch.
Expect Multiple shorter accounts with a very obvious agenda.s
Regarding bulk underground : The only question is will this be a block cave or a more selective sub level cave...? Anyone with mining nouse can see that.. The grade in those breccia are nothing short of sensational. And a mine in their own right.
Here we go with your 3-6 posts '1 month old dodge account' you won't last long here, believe me.... Spreading FUD - fear uncertainty and doubt - over the bulk underground, because that's essentially the only unknown left that such disingenuous posts can target.
Last year we had months and months of tecnhical FUD with the GreenTool and others - who said Havieron would never be economic... but here we are 12 months later with a gigantic starter deposit, a $50m decline going in, and $50m GGP cash funding to DFS, and a published phase 1 mine PFS to take to the bank ... so NCM can get ore to Telfer ASAP.
You may be able to confuse and scare the un-researched with your manipulation, but you cannot touch Bamps or me.
For the rest of you MrBig is a skilled and devious operator who last night was attempting to exploit an ostensibly clever argument. The posts were subsequently removed this am. For the correct reasons.
What he/she was trying to do last night was apply NCM's conservative, underground stoping phase 1 mine operational costs @ $84/tonne - actually $81/tonne according to GGP using the correct exchange rate to Bulk Underground production.
The first Stoping operation has naturally has lower volumes, due to the inherent volume limitations of the Stoping technique and higher costs - ore transport to surface limitation, requirement for drill and blast / explosives, and extra material handling, and subsequence labour in back pasting costs )
But you cannot apply this to the anticipated Bulk under ground block caving grades of the larger scale deposit where the cost per tonne would be circa $25-27/tonne
This is a totally and fundamentally inappropriate comparison made by BiggL - It's like comparing two completely different company cost structures, AND specifically designed to imply that anything under 1.5g is likely to be 'uneconomic'...
And It's total BS becuase we ALL know that Cadia is economic down to 0.4g/t Au... specifically due the bulk efficiencies of the operational costs.
And very much like comparing and interweaving the cost structure of building Ferraris directly to Ford Fiestas -
IE both make massive profits, BUT in TOTALLY different ways . Obviously You cannot make a profit building Ford fiestas in the way you build a Ferrari though. That would be loss making.
That's the best analogy I can come up with. And that is the tactic of this poster. Always Happy to smash them into touch.
Expect Multiple shorter accounts with a very obvious agenda.s
Regarding bulk underground : The only question is will this be a block cave or a more selective sub level cave...? Anyone with mining nouse can see that.. The grade in those breccia are nothing short of sensational. And a mine in their own right.
Here we go with your 3-6 posts '1 month old dodge account' you won't last long here, believe me.... Spreading FUD - fear uncertainty and doubt - over the bulk underground, because that's essentially the only unknown left that such disingenuous posts can target.
Last year we had months and months of tecnhical FUD with the GreenTool and others - who said Havieron would never be economic... but here we are 12 months later with a gigantic starter deposit, a $50m decline going in, and $50m GGP cash funding to DFS, and a published phase 1 mine PFS to take to the bank ... so NCM can get ore to Telfer ASAP.
You may be able to confuse and scare the un-researched with your manipulation, but you cannot touch Bamps or me.
For the rest of you MrBig is a skilled and devious operator who last night was attempting to exploit an ostensibly clever argument. The posts were subsequently removed this am. For the correct reasons.
What he/she was trying to do last night was apply NCM's conservative, underground stoping phase 1 mine operational costs @ $84/tonne - actually $81/tonne according to GGP using the correct exchange rate to Bulk Underground production.
The first Stoping operation has naturally has lower volumes, due to the inherent volume limitations of the Stoping technique and higher costs - ore transport to surface limitation, requirement for drill and blast / explosives, and extra material handling, and subsequence labour in back pasting costs )
But you cannot apply this to the anticipated Bulk under ground block caving grades of the larger scale deposit where the cost per tonne would be circa $25-27/tonne
This is a totally and fundamentally inappropriate comparison made by BiggL - It's like comparing two completely different company cost structures, AND specifically designed to imply that anything under 1.5g is likely to be 'uneconomic'...
And It's total BS becuase we ALL know that Cadia is economic down to 0.4g/t Au... specifically due the bulk efficiencies of the operational costs.
And very much like comparing and interweaving the cost structure of building Ferraris directly to Ford Fiestas -
IE both make massive profits, BUT in TOTALLY different ways . Obviously You cannot make a profit building Ford fiestas in the way you build a Ferrari though. That would be loss making.
That's the best analogy I can come up with. And that is the tactic of this poster. Always Happy to smash them into touch.
Expect Multiple shorter accounts with a very obvious agenda.s
Regarding bulk underground : The only question is will this be a block cave or a more selective sub level cave...? Anyone with mining nouse can see that.. The grade in those breccia are nothing short of sensational. And a mine in their own right.
Here we go with your 3-6 posts '1 month old dodge account' you won't last long here, believe me.... Spreading FUD - fear uncertainty and doubt - over the bulk underground, because that's essentially the only unknown left that such disingenuous posts can target.
Last year we had months and months of tecnhical FUD with the GreenTool and others - who said Havieron would never be economic... but here we are 12 months later with a gigantic starter deposit, a $50m decline going in, and $50m GGP cash funding to DFS, and a published phase 1 mine PFS to take to the bank ... so NCM can get ore to Telfer ASAP.
You may be able to confuse and scare the un-researched with your manipulation, but you cannot touch Bamps or me.
For the rest of you MrBig is a skilled and devious operator who last night was attempting to exploit an ostensibly clever argument. The posts were subsequently removed this am. For the correct reasons.
What he/she was trying to do last night was apply NCM's conservative, underground stoping phase 1 mine operational costs @ $84/tonne - actually $81/tonne according to GGP using the correct exchange rate to Bulk Underground production.
The first Stoping operation has naturally has lower volumes, due to the inherent volume limitations of the Stoping technique and higher costs - ore transport to surface limitation, requirement for drill and blast / explosives, and extra material handling, and subsequence labour in back pasting costs )
But you cannot apply this to the anticipated Bulk under ground block caving grades of the larger scale deposit where the cost per tonne would be circa $25-27/tonne
This is a totally and fundamentally inappropriate comparison made by BiggL - It's like comparing two completely different company cost structures, AND specifically designed to imply that anything under 1.5g is likely to be 'uneconomic'...
And It's total BS becuase we ALL know that Cadia is economic down to 0.4g/t Au... specifically due the bulk efficiencies of the operational costs.
And very much like comparing and interweaving the cost structure of building Ferraris directly to Ford Fiestas -
IE both make massive profits, BUT in TOTALLY different ways . Obviously You cannot make a profit building Ford fiestas in the way you build a Ferrari though. That would be loss making.
That's the best analogy I can come up with. And that is the tactic of this poster. Always Happy to smash them into touch.
Expect Multiple shorter accounts with a very obvious agenda.s
Regarding bulk underground : The only question is will this be a block cave or a more selective sub level cave...? Anyone with mining nouse can see that.. The grade in those breccia are nothing short of sensational. And a mine in their own right.
Here we go with your 3-6 posts '1 month old dodge account' you won't last long here, believe me.... Spreading FUD - fear uncertainty and doubt - over the bulk underground, because that's essentially the only unknown left that such disingenuous posts can target.
Last year we had months and months of tecnhical FUD with the GreenTool and others - who said Havieron would never be economic... but here we are 12 months later with a gigantic starter deposit, a $50m decline going in, and $50m GGP cash funding to DFS, and a published phase 1 mine PFS to take to the bank ... so NCM can get ore to Telfer ASAP.
You may be able to confuse and scare the un-researched with your manipulation, but you cannot touch Bamps or me.
For the rest of you MrBig is a skilled and devious operator who last night was attempting to exploit an ostensibly clever argument. The posts were subsequently removed this am. For the correct reasons.
What he/she was trying to do last night was apply NCM's conservative, underground stoping phase 1 mine operational costs @ $84/tonne - actually $81/tonne according to GGP using the correct exchange rate to Bulk Underground production.
The first Stoping operation has naturally has lower volumes, due to the inherent volume limitations of the Stoping technique and higher costs - ore transport to surface limitation, requirement for drill and blast / explosives, and extra material handling, and subsequence labour in back pasting costs )
But you cannot apply this to the anticipated Bulk under ground block caving grades of the larger scale deposit where the cost per tonne would be circa $25-27/tonne
This is a totally and fundamentally inappropriate comparison made by BiggL - It's like comparing two completely different company cost structures, AND specifically designed to imply that anything under 1.5g is likely to be 'uneconomic'...
And It's total BS becuase we ALL know that Cadia is economic down to 0.4g/t Au... specifically due the bulk efficiencies of the operational costs.
And very much like comparing and interweaving the cost structure of building Ferraris directly to Ford Fiestas -
IE both make massive profits, BUT in TOTALLY different ways . Obviously You cannot make a profit building Ford fiestas in the way you build a Ferrari though. That would be loss making.
That's the best analogy I can come up with. And that is the tactic of this poster. Always Happy to smash them into touch.
Expect Multiple shorter accounts with a very obvious agenda.s
Regarding bulk underground : The only question is will this be a block cave or a more selective sub level cave...? Anyone with mining nouse can see that.. The grade in those breccia are nothing short of sensational. And a mine in their own right.
Here we go with your 3-6 posts '1 month old dodge account' you won't last long here, believe me.... Spreading FUD - fear uncertainty and doubt - over the bulk underground, because that's essentially the only unknown left that such disingenuous posts can target.
Last year we had months and months of tecnhical FUD with the GreenTool and others - who said Havieron would never be economic... but here we are 12 months later with a gigantic starter deposit, a $50m decline going in, and $50m GGP cash funding to DFS, and a published phase 1 mine PFS to take to the bank ... so NCM can get ore to Telfer ASAP.
You may be able to confuse and scare the un-researched with your manipulation, but you cannot touch Bamps or me.
For the rest of you MrBig is a skilled and devious operator who last night was attempting to exploit an ostensibly clever argument. The posts were subsequently removed this am. For the correct reasons.
What he/she was trying to do last night was apply NCM's conservative, underground stoping phase 1 mine operational costs @ $84/tonne - actually $81/tonne according to GGP using the correct exchange rate to Bulk Underground production.
The first Stoping operation has naturally has lower volumes, due to the inherent volume limitations of the Stoping technique and higher costs - ore transport to surface limitation, requirement for drill and blast / explosives, and extra material handling, and subsequence labour in back pasting costs )
But you cannot apply this to the anticipated Bulk under ground block caving grades of the larger scale deposit where the cost per tonne would be circa $25-27/tonne
This is a totally and fundamentally inappropriate comparison made by BiggL - It's like comparing two completely different company cost structures, AND specifically designed to imply that anything under 1.5g is likely to be 'uneconomic'...
And It's total BS becuase we ALL know that Cadia is economic down to 0.4g/t Au... specifically due the bulk efficiencies of the operational costs.
And very much like comparing and interweaving the cost structure of building Ferraris directly to Ford Fiestas -
IE both make massive profits, BUT in TOTALLY different ways . Obviously You cannot make a profit building Ford fiestas in the way you build a Ferrari though. That would be loss making.
That's the best analogy I can come up with. And that is the tactic of this poster. Always Happy to smash them into touch.
Expect Multiple shorter accounts with a very obvious agenda.s
Regarding bulk underground : The only question is will this be a block cave or a more selective sub level cave...? Anyone with mining nouse can see that.. The grade in those breccia are nothing short of sensational. And a mine in their own right.
Here we go with your 3-6 posts '1 month old dodge account' you won't last long here, believe me.... Spreading FUD - fear uncertainty and doubt - over the bulk underground, because that's essentially the only unknown left that such disingenuous posts can target.
Last year we had months and months of tecnhical FUD with the GreenTool and others - who said Havieron would never be economic... but here we are 12 months later with a gigantic starter deposit, a $50m decline going in, and $50m GGP cash funding to DFS, and a published phase 1 mine PFS to take to the bank ... so NCM can get ore to Telfer ASAP.
You may be able to confuse and scare the un-researched with your manipulation, but you cannot touch Bamps or me.
For the rest of you MrBig is a skilled and devious operator who last night was attempting to exploit an ostensibly clever argument. The posts were subsequently removed this am. For the correct reasons.
What he/she was trying to do last night was apply NCM's conservative, underground stoping phase 1 mine operational costs @ $84/tonne - actually $81/tonne according to GGP using the correct exchange rate to Bulk Underground production.
The first Stoping operation has naturally has lower volumes, due to the inherent volume limitations of the Stoping technique and higher costs - ore transport to surface limitation, requirement for drill and blast / explosives, and extra material handling, and subsequence labour in back pasting costs )
But you cannot apply this to the anticipated Bulk under ground block caving grades of the larger scale deposit where the cost per tonne would be circa $25-27/tonne
This is a totally and fundamentally inappropriate comparison made by BiggL - It's like comparing two completely different company cost structures, AND specifically designed to imply that anything under 1.5g is likely to be 'uneconomic'...
And It's total BS becuase we ALL know that Cadia is economic down to 0.4g/t Au... specifically due the bulk efficiencies of the operational costs.
And very much like comparing and interweaving the cost structure of building Ferraris directly to Ford Fiestas -
IE both make massive profits, BUT in TOTALLY different ways . Obviously You cannot make a profit building Ford fiestas in the way you build a Ferrari though. That would be loss making.
That's the best analogy I can come up with. And that is the tactic of this poster. Always Happy to smash them into touch.
Expect Multiple shorter accounts with a very obvious agenda.s
Regarding bulk underground : The only question is will this be a block cave or a more selective sub level cave...? Anyone with mining nouse can see that.. The grade in those breccia are nothing short of sensational. And a mine in their own right.
Here we go with your 3-6 posts '1 month old dodge account' you won't last long here, believe me.... Spreading FUD - fear uncertainty and doubt - over the bulk underground, because that's essentially the only unknown left that such disingenuous posts can target.
Last year we had months and months of tecnhical FUD with the GreenTool and others - who said Havieron would never be economic... but here we are 12 months later with a gigantic starter deposit, a $50m decline going in, and $50m GGP cash funding to DFS, and a published phase 1 mine PFS to take to the bank ... so NCM can get ore to Telfer ASAP.
You may be able to confuse and scare the un-researched with your manipulation, but you cannot touch Bamps or me.
For the rest of you MrBig is a skilled and devious operator who last night was attempting to exploit an ostensibly clever argument. The posts were subsequently removed this am. For the correct reasons.
What he/she was trying to do last night was apply NCM's conservative, underground stoping phase 1 mine operational costs @ $84/tonne - actually $81/tonne according to GGP using the correct exchange rate to Bulk Underground production.
The first Stoping operation has naturally has lower volumes, due to the inherent volume limitations of the Stoping technique and higher costs - ore transport to surface limitation, requirement for drill and blast / explosives, and extra material handling, and subsequence labour in back pasting costs )
But you cannot apply this to the anticipated Bulk under ground block caving grades of the larger scale deposit where the cost per tonne would be circa $25-27/tonne
This is a totally and fundamentally inappropriate comparison made by BiggL - It's like comparing two completely different company cost structures, AND specifically designed to imply that anything under 1.5g is likely to be 'uneconomic'...
And It's total BS becuase we ALL know that Cadia is economic down to 0.4g/t Au... specifically due the bulk efficiencies of the operational costs.
And very much like comparing and interweaving the cost structure of building Ferraris directly to Ford Fiestas -
IE both make massive profits, BUT in TOTALLY different ways . Obviously You cannot make a profit building Ford fiestas in the way you build a Ferrari though. That would be loss making.
That's the best analogy I can come up with. And that is the tactic of this poster. Always Happy to smash them into touch.
Expect Multiple shorter accounts with a very obvious agenda.s
Regarding bulk underground : The only question is will this be a block cave or a more selective sub level cave...? Anyone with mining nouse can see that.. The grade in those breccia are nothing short of sensational. And a mine in their own right.
Here we go with your 3-6 posts '1 month old dodge account' you won't last long here, believe me.... Spreading FUD - fear uncertainty and doubt - over the bulk underground, because that's essentially the only unknown left that such disingenuous posts can target.
Last year we had months and months of tecnhical FUD with the GreenTool and others - who said Havieron would never be economic... but here we are 12 months later with a gigantic starter deposit, a $50m decline going in, and $50m GGP cash funding to DFS, and a published phase 1 mine PFS to take to the bank ... so NCM can get ore to Telfer ASAP.
You may be able to confuse and scare the un-researched with your manipulation, but you cannot touch Bamps or me.
For the rest of you MrBig is a skilled and devious operator who last night was attempting to exploit an ostensibly clever argument. The posts were subsequently removed this am. For the correct reasons.
What he/she was trying to do last night was apply NCM's conservative, underground stoping phase 1 mine operational costs @ $84/tonne - actually $81/tonne according to GGP using the correct exchange rate to Bulk Underground production.
The first Stoping operation has naturally has lower volumes, due to the inherent volume limitations of the Stoping technique and higher costs - ore transport to surface limitation, requirement for drill and blast / explosives, and extra material handling, and subsequence labour in back pasting costs )
But you cannot apply this to the anticipated Bulk under ground block caving grades of the larger scale deposit where the cost per tonne would be circa $25-27/tonne
This is a totally and fundamentally inappropriate comparison made by BiggL - It's like comparing two completely different company cost structures, AND specifically designed to imply that anything under 1.5g is likely to be 'uneconomic'...
And It's total BS becuase we ALL know that Cadia is economic down to 0.4g/t Au... specifically due the bulk efficiencies of the operational costs.
And very much like comparing and interweaving the cost structure of building Ferraris directly to Ford Fiestas -
IE both make massive profits, BUT in TOTALLY different ways . Obviously You cannot make a profit building Ford fiestas in the way you build a Ferrari though. That would be loss making.
That's the best analogy I can come up with. And that is the tactic of this poster. Always Happy to smash them into touch.
Expect Multiple shorter accounts with a very obvious agenda.s
Regarding bulk underground : The only question is will this be a block cave or a more selective sub level cave...? Anyone with mining nouse can see that.. The grade in those breccia are nothing short of sensational. And a mine in their own right.
Here we go with your 3-6 posts '1 month old dodge account' you won't last long here, believe me.... Spreading FUD - fear uncertainty and doubt - over the bulk underground, because that's essentially the only unknown left that such disingenuous posts can target.
Last year we had months and months of tecnhical FUD with the GreenTool and others - who said Havieron would never be economic... but here we are 12 months later with a gigantic starter deposit, a $50m decline going in, and $50m GGP cash funding to DFS, and a published phase 1 mine PFS to take to the bank ... so NCM can get ore to Telfer ASAP.
You may be able to confuse and scare the un-researched with your manipulation, but you cannot touch Bamps or me.
For the rest of you MrBig is a skilled and devious operator who last night was attempting to exploit an ostensibly clever argument. The posts were subsequently removed this am. For the correct reasons.
What he/she was trying to do last night was apply NCM's conservative, underground stoping phase 1 mine operational costs @ $84/tonne - actually $81/tonne according to GGP using the correct exchange rate to Bulk Underground production.
The first Stoping operation has naturally has lower volumes, due to the inherent volume limitations of the Stoping technique and higher costs - ore transport to surface limitation, requirement for drill and blast / explosives, and extra material handling, and subsequence labour in back pasting costs )
But you cannot apply this to the anticipated Bulk under ground block caving grades of the larger scale deposit where the cost per tonne would be circa $25-27/tonne
This is a totally and fundamentally inappropriate comparison made by BiggL - It's like comparing two completely different company cost structures, AND specifically designed to imply that anything under 1.5g is likely to be 'uneconomic'...
And It's total BS becuase we ALL know that Cadia is economic down to 0.4g/t Au... specifically due the bulk efficiencies of the operational costs.
And very much like comparing and interweaving the cost structure of building Ferraris directly to Ford Fiestas -
IE both make massive profits, BUT in TOTALLY different ways . Obviously You cannot make a profit building Ford fiestas in the way you build a Ferrari though. That would be loss making.
That's the best analogy I can come up with. And that is the tactic of this poster. Always Happy to smash them into touch.
Expect Multiple shorter accounts with a very obvious agenda.s
Regarding bulk underground : The only question is will this be a block cave or a more selective sub level cave...? Anyone with mining nouse can see that.. The grade in those breccia are nothing short of sensational. And a mine in their own right.
Here we go with your 3-6 posts '1 month old dodge account' you won't last long here, believe me.... Spreading FUD - fear uncertainty and doubt - over the bulk underground, because that's essentially the only unknown left that such disingenuous posts can target.
Last year we had months and months of tecnhical FUD with the GreenTool and others - who said Havieron would never be economic... but here we are 12 months later with a gigantic starter deposit, a $50m decline going in, and $50m GGP cash funding to DFS, and a published phase 1 mine PFS to take to the bank ... so NCM can get ore to Telfer ASAP.
You may be able to confuse and scare the un-researched with your manipulation, but you cannot touch Bamps or me.
For the rest of you MrBig is a skilled and devious operator who last night was attempting to exploit an ostensibly clever argument. The posts were subsequently removed this am. For the correct reasons.
What he/she was trying to do last night was apply NCM's conservative, underground stoping phase 1 mine operational costs @ $84/tonne - actually $81/tonne according to GGP using the correct exchange rate to Bulk Underground production.
The first Stoping operation has naturally has lower volumes, due to the inherent volume limitations of the Stoping technique and higher costs - ore transport to surface limitation, requirement for drill and blast / explosives, and extra material handling, and subsequence labour in back pasting costs )
But you cannot apply this to the anticipated Bulk under ground block caving grades of the larger scale deposit where the cost per tonne would be circa $25-27/tonne
This is a totally and fundamentally inappropriate comparison made by BiggL - It's like comparing two completely different company cost structures, AND specifically designed to imply that anything under 1.5g is likely to be 'uneconomic'...
And It's total BS becuase we ALL know that Cadia is economic down to 0.4g/t Au... specifically due the bulk efficiencies of the operational costs.
And very much like comparing and interweaving the cost structure of building Ferraris directly to Ford Fiestas -
IE both make massive profits, BUT in TOTALLY different ways . Obviously You cannot make a profit building Ford fiestas in the way you build a Ferrari though. That would be loss making.
That's the best analogy I can come up with. And that is the tactic of this poster. Always Happy to smash them into touch.
Expect Multiple shorter accounts with a very obvious agenda.s
Regarding bulk underground : The only question is will this be a block cave or a more selective sub level cave...? Anyone with mining nouse can see that.. The grade in those breccia are nothing short of sensational. And a mine in their own right.
Here we go with your 3-6 posts '1 month old dodge account' you won't last long here, believe me.... Spreading FUD - fear uncertainty and doubt - over the bulk underground, because that's essentially the only unknown left that such disingenuous posts can target.
Last year we had months and months of tecnhical FUD with the GreenTool and others - who said Havieron would never be economic... but here we are 12 months later with a gigantic starter deposit, a $50m decline going in, and $50m GGP cash funding to DFS, and a published phase 1 mine PFS to take to the bank ... so NCM can get ore to Telfer ASAP.
You may be able to confuse and scare the un-researched with your manipulation, but you cannot touch Bamps or me.
For the rest of you MrBig is a skilled and devious operator who last night was attempting to exploit an ostensibly clever argument. The posts were subsequently removed this am. For the correct reasons.
What he/she was trying to do last night was apply NCM's conservative, underground stoping phase 1 mine operational costs @ $84/tonne - actually $81/tonne according to GGP using the correct exchange rate to Bulk Underground production.
The first Stoping operation has naturally has lower volumes, due to the inherent volume limitations of the Stoping technique and higher costs - ore transport to surface limitation, requirement for drill and blast / explosives, and extra material handling, and subsequence labour in back pasting costs )
But you cannot apply this to the anticipated Bulk under ground block caving grades of the larger scale deposit where the cost per tonne would be circa $25-27/tonne
This is a totally and fundamentally inappropriate comparison made by BiggL - It's like comparing two completely different company cost structures, AND specifically designed to imply that anything under 1.5g is likely to be 'uneconomic'...
And It's total BS becuase we ALL know that Cadia is economic down to 0.4g/t Au... specifically due the bulk efficiencies of the operational costs.
And very much like comparing and interweaving the cost structure of building Ferraris directly to Ford Fiestas -
IE both make massive profits, BUT in TOTALLY different ways . Obviously You cannot make a profit building Ford fiestas in the way you build a Ferrari though. That would be loss making.
That's the best analogy I can come up with. And that is the tactic of this poster. Always Happy to smash them into touch.
Expect Multiple shorter accounts with a very obvious agenda.s
Regarding bulk underground : The only question is will this be a block cave or a more selective sub level cave...? Anyone with mining nouse can see that.. The grade in those breccia are nothing short of sensational. And a mine in their own right.
The further warrants won't be cashed in any time soon, maybe when the SP is 50p to £1. That is the benefit of investing for the II.
Its also clear from the RNS that the wording of the placing is plural, so at least 2 Institutions took shares and warrants in the placing.
The usual dxmbfxck crew and FullMonte and his stop loss and problems with dust at mining sites.
It's like the muppet show on here ffs.
So we are told its all a big con now.
A con which has gone on for 2 years in which the SP has gone up 8000% and now back to just 3000% up.
A con on which Top banks, UBS, DLA Piper and now Wardell Armstrong International appear to know nothing of.
Top Institutions have invested millions and not sold , strange if its a con.
None of the BOD have sold a share, even at 42p or 15p.
AC has re - aquired his shares,weird thing to do if its a big con.
Queeld not sold a share either.
New II bought at 26p and options to take more at same price.
Now who to believe... World famous companies that have invested in Eurasia ?
... World famous companies that are working with Eurasia ?
... A BOD who have taken wages in shares and hold 20% of company ?
Or a bunch of trolling losers who trot out BS day after day ..just out of the goodness of their hearts to save you from losing money.
If you can't work out the answer then you shouldn't be investing really.
Rusty. "AIM is like a Schozophrenic"