RE: Presentation written Q and A8 Jun 2022 16:34
Some interesting answers:
To drill a 15 square metre face with handheld, Vast needs a team of 5 people. The Company needs 60 holes of 1.2 metre length = 72 metres of hole total , @ 0.3 metres per minute = 240 minutes drilling (240 / 60 = 4.8 hours). With hole setup and collar time, close to a full 6 hour shift is required to drill the 15 square metres of face.
With the Mantis rig, Vast needs a team of two people. We drill 60 holes at a 2.4m length for 144 metres of total hole length, at a penetration rate of 1.05 metres per minute = 151 minutes of drilling (151 / 60 = 2.5 hours of drilling). With setup and hole change, probably 3 – 3.5 hours total to drill a full face and achieve double the advance (1.2 meters versus 2.4 metres) with half the people.
Q37: Does that mean that we still have funding for zim through atlas? Or will we need to organise funding should a contract present itself?
The Company will not be going back to Atlas for any further funding.
Should the contract present itself, Vast has prepared other finance solutions.
Most of the directors have not taken salaries for the past 3-9 months
Q40: What is the current non-board headcount at VAST? Is this likely to stay stable until May 23?
Approximately 390 people, and yes, this number is expected to stay stable until May 2023.