RE: Havieron22 Mar 2021 18:07
This is a post I did about the sub level caving which will pay for the deeper mine:-
Start 2024 till 2033
54m tons over 9 years
6,000,000 tons per annum @3.8g/t divided by 31.1
= c733,000 ounces
x $1,000 after taking out costs
= $733,000,000 per annum for gold
copper 6,000,000 tons at 0.6%
=36,000 tons
x $9,200
= c$331,200,000
Total c$1,064,000,000 per annum
30%= $319,200,000 from 2024 per annum
£228,658,920 per year for Ggp for 9 years
54m tons divided by 6m = 9 years
although this was before the latest results and will increase the MRE figure of 54m
ATB:))