RE: MRE's9 Aug 2021 10:40
If anyone is confused about what is happening with the MRE’s coming I would suggest re reading the initial MRE RNS fro last December.
A few snippets:-
? 2021 Growth Drilling: Growth drilling programme in calendar year 2021 will focus on the extension and definition of the South Eastern Crescent and Breccia, North West Crescent, Northern Breccia and Eastern Breccia zones adjacent to the current Inferred Resource.
? Infill Drilling Programme: Infill drilling is underway on the top 350 vertical metres of the South Eastern Crescent within the existing resource outline with the aim to define Indicated resources to underpin the proposed Pre-Feasibility Study.
The gold equivalent (AuEq) is based on assumed prices of US$1,400/oz Au and US$3.40/lb Cu, gold recoveries of 94% (Crescent) and 84% (Breccia), and copper recoveries of 84% (Crescent) and 82% (Breccia), which equates to a formula of approximately AuEq = Au (g/t) + 1.65 * Cu (%). In Greatland’s opinion both gold and copper have a reasonable potential to be recovered and sold.
The Initial Inferred Mineral Resource estimate, assuming mining by a bulk extractable underground operation, reported inside an AUD$50/t Net Smelter Return (“NSR”) shell3, including geological domains of:
? Crescent Zone containing 18Mt @ 3.8g/t Au and 0.61% Cu for 2.2Moz Au and 110Kt Cu.
? Breccia Zone containing 34Mt @ 1.1g/t Au and 0.15% Cu for 1.2Moz Au and 50Kt Cu.
South East Crescent and Breccia: Mineralisation remains open at depth in high grade shoots as demonstrated in previously reported HAD065W2^^ which included 120.7m @ 9.3g/t Au & 0.18% Cu from 1349.3m. Growth drilling in calendar year 2021 will focus on the extensions and definition of the identified zones external to the current Inferred Resource.
From that you can see that the new Indicated resource estimate will come with the PFS and will be based on the top 350m of the SE crescent.
We know with later results that the sulphide zone has increased up from 18m tons.
We also know that the grades are up from 3.8g/t to 5g/t.
Below this 350m layer we know that the grades and volumes have increased
Therefore an Inferred resource as announced by SD in December should increase considerably.
Sandeep had suggested the PFS would be hopefully produced in September.
My conclusion is don’t expect a great uplift with the Indicated, that’s not the whole point of the PFS, expect a plan for the way forward to a mine, that is where the fireworks will be :))