RE: Testing8 Oct 2019 11:19
Diminvestor, great post thank you.
However, your line and main threat is about stimulation, ‘ Stimulation has always been a likely necessity. I believe that MB stated in a presentation that the Block 19 wells nearby are stimulated.‘ From the RNS we are told simulation equipment is not on site and is in the neighbouring block, if required. This to me indicates their modelling may now show this will flow naturally giving the better than expected porosity and permeability. Of course they may decide to stimulate, as it is now common practice.
But at the moment they don’t expect to need it or it would be onsite.... AIMHO.....