RE: Kosmos4 Aug 2025 07:45
Very positive contrary to what JBOTAMAX would like you to believe….. he’s going to have a busy day today
https://investors.kosmosenergy.com/news-releases/news-release-details/kosmos-energy-announces-second-quarter-2025-results
At Jubilee (38.6% working interest), oil production in the second quarter averaged approximately 55,300 bopd gross, reflecting nine days of scheduled FPSO shutdown, a period of riser instability, which has since been addressed with riser base gas lift, and underperformance of certain wells in the eastern side of the field, including Jubilee Southeast. Facility uptime was 97% with voidage replacement around 104%.
The Noble Venturer rig successfully drilled and completed the first well of the 2025/26 drilling campaign. This Jubilee main field producer (J-72) encountered more pay than expected and is currently producing around 10,000 bopd gross. The 2025 rig program has been optimized to drill a second producer in the Jubilee main field. As a result the rig will now undergo a period of scheduled maintenance before drilling the second well, which is expected online around the end of the year. Following completion of the second well, the rig is scheduled to drill four additional wells on Jubilee in 2026, targeting well-defined Jubilee main field producers, supported by good adjacent well control, similar to J-72.
As previously communicated, to achieve the full production potential of the Jubilee field, a consistent drilling program is required, informed by the latest seismic technology, alongside high facility uptime and sustained water injection. The narrow-azimuth (NAZ) seismic acquired in the first quarter is now being processed and the fast-track results show a significant uplift in imaging quality. We expect the imaging quality to be further enhanced through the acquisition of ocean bottom node (OBN) seismic, which is planned for later this year. The OBN data is expected to upgrade the velocity model to further improve the NAZ processing. These enhanced seismic products are expected to benefit future drilling campaigns, identifying undrilled lobes, unswept oil, and new opportunities in Jubilee Southeast.
During the second quarter, Kosmos and partners signed a Memorandum of Understanding (MoU) with the Government of Ghana to extend the production licenses to 2040. The partnership anticipates submitting the documentation to the government shortly with formal approval expected later in the year. On completion, Kosmos expects a material uplift in 2P reserves in Ghana.