RE: Graphite29 Apr 2021 15:44
for clarity, the figures i put up were for the material, not processed into sherical graphite, this would command a higher price.
my fag packet calc would be as follows for the total value of the raw material (it is only fag packet so don't knock me)
250,000t of raw material at Amistoq @ 28% graphite = 70,000t of graphite
of which from the RNS i think it mentioned 85% was jumbo/super suitable for processing to spherical graphite
70.000 x 85% = 59,500t of jumbo graphite and 10,500t of "other" sized graphite
59,500 x 6175 = $367,412,500 or £264,325,540 (lets say £264m for ease)
10,500 x $663 (the average price of the other grades) = $6,961,500 or £5,008,273 (lets say £5m)
total rough value is therefor approx £269m split over the life of the mine just for Amistoq, we shouldn't forget the Graphite on the other island within our license