what we have been told over the years18 Aug 2020 12:37
I've gone through a few years of release from Roxi/casp and we are no further down the road than we were 4 years ago. We have been waiting over a year for the acid. Why hasn’t it been used yet. I wouldn’t hold your breath for any deeps either. If they drilled 3 holes 5 years ago and said to be sitting on 58KMs worth. Read below for the amount of times they have said something good about the deeps BUT they are still not flowing , part 1
Deep Well A6 29/2/2016
As previously announced Deep Well A6 was spudded in early November 2015 and is to be drilled to a planned total depth of 5,000 meters.
Deep Well A6 12/4/2016
Deep Well A6 was spudded in early November 2015 and is to be drilled to a planned total depth of 5,000 meters.
Deep Well A5 was drilled to a depth of 4,442 meters, and for brief periods of up to two hours at a time the well flowed oil at the rate of 2,000 bopd before becoming blocked by the accumulation of unrecovered heavy drilling fluids becoming set in the oil pipe.
The rig initially identified for testing was used on other activities but is now back on site for a new attempt to clear the blocked well using coil tubing equipment.
Deep Well 801
As previously reported Deep Well 801, which was drilled to a depth of 5,050 meters, has suffered from blockages caused by excess drilling fluids. Following extensive chemical cleaning the pressure in the well has grown to 240 bar. Our intention is to open the well for testing once the pressure reaches 300 bar.
Deep Wells 19/10/2016
Our deep drilling exploration has to date been contained in the Ayrshagyl portion of the BNG block which extends over an area of some 120 sq km., where we have drilled three deep wells, A5, 801 and A6 to depths of 4,442, 5,050, and 4,528 meters respectively.
Deep Well A6 28/10/2016
From the analysis of wireline logging , gross oil-bearing intervals totalling 127 meters have been identified. These are in two intervals, the first of 72 meters between depths of 4,313 meters and 4,385 meters. The second is of 55 meters between depths of 4,450 and 4,505 meters. Further analysis will be conducted to determine the portion of these intervals that are capable of producing commercial volumes of oil ( net pay ).
We now plan to complete the well by cementing a 5-inch liner to the Total Depth of the well.
Following this we intend to perforate the interval between 4,450 - 4,505 meters to allow a 90 day flow test to commence without delay.
10-01-2017
The need to repeat the perforation work at Deep Well A6 is frustrating but the board believe it is unlikely to have any material impact on the final outcome at the well, which we believe remains very encouraging." CC
Nothing on the deeps for 5 months then a bit of rubbish in May about A6 followed by more rubbish in July and nothing done. Wrong type of mud bla bla bla.