Less Ads, More Data, More Tools Register for FREE
Sponsored Content
Don't want ads? Click here
Sponsored Content
Don't want ads? Click here

Pin to quick picksOracle Power Share News (ORCP)

Share Price Information for Oracle Power (ORCP)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.0145
Bid: 0.014
Ask: 0.015
Change: 0.00 (0.00%)
Spread: 0.001 (7.143%)
Open: 0.0145
High: 0.0145
Low: 0.0145
Prev. Close: 0.0145
ORCP Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Timelines are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Oracle Power upbeat on study into proposed Pakistan hydrogen project

Tue, 06th Feb 2024 12:44

(Sharecast News) - Oracle Power announced the successful completion of a comprehensive technical and commercial feasibility study on Tuesday, conducted by China Electric Power Equipment and Technology (CET), a wholly owned subsidiary of State Grid Corporation of China (SGCC), along with Shanghai Investigation, and Design and Research Institute (SIDRI).

The AIM-traded firm said the study pertained to the proposed hybrid renewable power plant for its green hydrogen and green ammonia project in Pakistan.

It said the project, being developed by a joint venture company, was aiming to establish a 400 MW green hydrogen production facility with an annual output of 55,000 tonnes of green hydrogen.

The renewable power facility would be situated in the designated wind corridor within the province of Sindh in southern Pakistan.

It said the completed study indicated that the project would involve the deployment of 800 MW of solar - an increase from the original 700 MW - as well as 500 MW of wind power and 450 MWh of battery energy storage to support green hydrogen production.

Notably, the study categorised the solar energy resource at the site as grade A, reflecting its high richness.

Beyond technical assessments, the study also addressed regulatory and environmental considerations during the construction phase.

The proposed location in the Thatta district of Sindh province, within the Gharo-Jhimpir wind corridor, would position the plant for potential future green hydrogen production and supply to Pakistan and neighbouring economies.

Oracle said it envisioned Pakistan becoming a significant player in the global green hydrogen market by capitalising on its abundant land and substantial renewable resources.

In line with the project's evolution, Oracle Energy and CET were actively exploring safe and cost-effective systems for green hydrogen shipment and transportation.

The board said Karachi's robust infrastructure, featuring two world-class ports, offered a feasible gateway for supplying hydrogen to potential buyers across various regions.

"This study for 1.3 GW of renewable power at our site in Jhimpir contributes significantly to further de-risking the project and provides a clearer pathway for accelerated development activities," said chief executive officer Naheed Memon.

"We continue to work on the completion of the grid interconnectivity feasibility studies in collaboration with SGCC, as well as geotechnical and environmental studies, which will follow soon after, leading us into the FEED stage and future confirmation of potential off-take and financing arrangements."

At 1028 GMT, shares in Oracle Power were down 5% at 0.03p.

Reporting by Josh White for Sharecast.com.

More News
13 Jul 2021 12:57

IN BRIEF: Oracle Power progresses in Australia amid delay in Pakistan

IN BRIEF: Oracle Power progresses in Australia amid delay in Pakistan

Read more
13 Jul 2021 11:20

AIM WINNERS & LOSERS: Star Phoenix wins new deal; Ebiquity revenue up

AIM WINNERS & LOSERS: Star Phoenix wins new deal; Ebiquity revenue up

Read more
9 Jul 2021 21:41

TRADING UPDATES: JD Sports vows diversity, Sainsbury faces mini-revolt

TRADING UPDATES: JD Sports vows diversity, Sainsbury faces mini-revolt

Read more
9 Jul 2021 10:05

Oracle Power designs drilling programme for Western Australia project

(Sharecast News) - Natural resources and power project developer Oracle Power announced on Friday that a proposed drilling programme had now been designed for the Northern Zone Gold Project, 25 kilometres east of Kalgoorlie in the state of Western Australia.

Read more
5 Jul 2021 18:49

TRADING UPDATES: AVI wants Third Point change; ADVFN plans dividend

TRADING UPDATES: AVI wants Third Point change; ADVFN plans dividend

Read more
5 Jul 2021 14:52

Oracle Power begins sampling programme at Jundee East

(Sharecast News) - Oracle Power announced on Monday that the geochemical sampling programme covering almost the entire tenement at its wholly-owned Jundee East Gold Project was now underway.

Read more
23 Jun 2021 17:25

TRADING UPDATES: Marlowe turns to loss; AFC Energy sees maiden revenue

TRADING UPDATES: Marlowe turns to loss; AFC Energy sees maiden revenue

Read more
14 Jun 2021 11:31

Oracle Power gets promising results from Jundee East gold survey

Oracle Power gets promising results from Jundee East gold survey

Read more
24 May 2021 19:23

TRADING UPDATES: HSBC issues bond notes; Zegona to return capital

TRADING UPDATES: HSBC issues bond notes; Zegona to return capital

Read more
14 Apr 2021 11:42

AIM WINNERS & LOSERS: K3 Capital jumps on positive outlook

AIM WINNERS & LOSERS: K3 Capital jumps on positive outlook

Read more
14 Apr 2021 11:30

IN BRIEF: Oracle Power expects "highly productive" year

IN BRIEF: Oracle Power expects "highly productive" year

Read more
9 Mar 2021 13:48

IN BRIEF: Oracle Power reveals new greenstone belt at Jundee project

IN BRIEF: Oracle Power reveals new greenstone belt at Jundee project

Read more
3 Mar 2021 16:27

EXECUTIVE CHANGES: Beazley CEO Departs For Australia; Hipgnosis hires

EXECUTIVE CHANGES: Beazley CEO Departs For Australia; Hipgnosis hires

Read more
26 Feb 2021 17:57

LONDON TRADING UPDATES: Castings Hails Return To Pre-Covid Levels

LONDON TRADING UPDATES: Castings Hails Return To Pre-Covid Levels

Read more
15 Feb 2021 11:43

IN BRIEF: Oracle Power Completes Jundee East Initial Sampling

IN BRIEF: Oracle Power Completes Jundee East Initial Sampling

Read more

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.