We would love to hear your thoughts about our site and services, please take our survey here.
London South East prides itself on its community spirit, and in order to keep the chat section problem free, we ask all members to follow these simple rules. In these rules, we refer to ourselves as "we", "us", "our". The user of the website is referred to as "you" and "your".
By posting on our share chat boards you are agreeing to the following:
The IP address of all posts is recorded to aid in enforcing these conditions. As a user you agree to any information you have entered being stored in a database. You agree that we have the right to remove, edit, move or close any topic or board at any time should we see fit. You agree that we have the right to remove any post without notice. You agree that we have the right to suspend your account without notice.
Please note some users may not behave properly and may post content that is misleading, untrue or offensive.
It is not possible for us to fully monitor all content all of the time but where we have actually received notice of any content that is potentially misleading, untrue, offensive, unlawful, infringes third party rights or is potentially in breach of these terms and conditions, then we will review such content, decide whether to remove it from this website and act accordingly.
Premium Members are members that have a premium subscription with London South East. You can subscribe here.
London South East does not endorse such members, and posts should not be construed as advice and represent the opinions of the authors, not those of London South East Ltd, or its affiliates.
i posted this translation for the purposes of building a picture of what shclum have been doing and trying to do.
for information purposes, as it may be relevant at a later date - who knows.
Surface water bodies will cross at the site, resulting in there Risk of surface water pollution.Construction of Category I, Class V high pressure gas pipeline and Exploitation considering location, specificity and scale May cause significant environmental impact.Taking into account the above criteria, “environmental assessment Article 7, Part 6 of Article 7, Paragraph 3 of the Code, 3.3 and Based on paragraph 9.11 of paragraph 9
Fragrances:
1. To make a screening decision that “Schlumberger RustaveliKomfani Limited (Branch) - Georgian Category I gas pipelineConstruction and operation will be subject to environmental impact Evaluation;
2. "Schlumberger Rustaveli Company Limited (Branch) - Georgia"Is obliged to ensure the 8th of the "Environmental Assessment Code"Go through the scoping procedure established by Article;
3. The order should be sent immediately to Schlumberger Rustaveli Company Limited(Branch) - Georgia ";
4. The order shall enter into force “Schlumberger Rustaveli Kompani Limited(Branch) - "Georgia" upon receipt of this order;
5. Decision within 5 days after the issuance of the screening decision To be placed Of the Ministry Official On the website And Gardabani Municipality Executive And / orOn the information board of the representative bodies;
6. Command it is possible To appeal Tbilisi Urban The court In the Board of Administrative Cases (Tbilisi, D. Agmashenebeli Alley, 12th Km. N6) one month from the date of official notification by the party Within.
Levan Davitashvili - minister
In the case of temporary accommodation for staff and required Arranging infrastructure.
Harmful to the ambient air is expected during the construction works Dispersion of substances and noise of construction equipment. During construction The source of impact on the atmospheric air is construction equipment Exhaust emitted by engine operation and when moving equipment Generated dust. In the vicinity of the project area, it is planned "Tbilisi-Implementation of "Bakurtsikhe" highway reconstruction project, which led to May be Cause Cumulative Impact Atmospheric In the air In terms of impact. During operation in ambient air Spills of harmful substances are expected between the pipe clamps Existing gas output and noise generation of the gas processor During the operation of the station.
During the earthworks, the soil will be removed and stored In accordance with the legislation of Georgia.
According to the screening statement will be generated at the stage of construction of the pipeline Hazardous and non-hazardous waste, while waste during the operation phase Emergence is not expected. Waste will occur in the project area Separate collection. Hazardous waste is transferred to this type of waste An organization with appropriate authority to manage. Land works During the execution it is expected to form a soil, which will be managed and placed Must be done in compliance with the relevant conditions.
Depending on the specifics of the activity, there is a large-scale accident and / or Some risk of disaster. Safety at railway crossing points The purpose is to make a hose and a spark plug.In case of pressure drop in the gas pipeline, the gas supply will be automatic Lock.
Pneumatic or hydraulic will be used during the pipeline test Method. In the case of hydraulic testing, surface water will occur Taking water from facilities. The pipeline crosses ravines and reclamation canals;Resulting in a risk of contamination of surface water bodies.
Due to the specifics of the activity there is a cultural heritage Probability of discovery / impact on monuments. Archaeological site discovery In this case, the Law of Georgia on Cultural Heritage will be implemented Carrying out the measures provided.
The project corridor of the pipeline will pass over the Iori plateau, where it is presented Steppe, forest-steppe, arid forest and semi-desert-like type Landscapes. Given the length of the gas pipeline (20.6 km.), There is Risk of vegetation impact. With this the gas pipeline is certain The section will pass along the settlement, crossing the agricultural Destination plots, dirt and asphalt roads, railway line,Various purpose pipelines, communication lines, as well as several
https://mepa.gov.ge/Ge/Files/Download/17266
dated jun 2019....
Page 1
N 2-551
17/06/2019
In Gardabani municipality, “Schlumberger Rustaveli Company Limited(Branch) - Construction of Georgia Category I gas pipeline and About the screening decision on operation.
Schlumberger Rustaveli Kompani Limited (Branch) - GeorgiaTo determine the need for conducting the Environment and Rural of Georgia Gas is represented in the Ministry of Agriculture in Gardabani Municipality Scheduling project for pipeline construction and operation.
The submitted documents establish that “Schlumberger Rustaveli Company Limited (Branch) - Georgia "plans Category I, Class V high pressure(5.4 MPa / 54 kg / cm 2 ) Gas pipeline construction and operation From extraction well (village Sartichala, GPS coordinates: X - 515265, Y -4618476) to the main gas pipeline (Vaziani village, GPS coordinates: X - 502976, Y- 4612883). The total length of the pipeline is 20.6 km. The project as well Provides arrangement of gas processing (pumping-filtration) station.Presented along a section of the gas pipeline starting at 1100 m in length Residential houses. During the electronic verification of the pipeline corridor It was found that the nearest residential house is away from the pipeline About 40 meters.
The diameter of the project pipeline is 219 mm (112 mm is planned for certain sections Use of mm and 114 mm diameter pipes). The pipes will be placed from 1.1 meters to 1.3 In a trench up to a meter deep. The pipeline crosses the railway lines (three crossings),Reclamation canals, water supply pipes, power lines, cable Communications, agricultural land, ravines, ground And asphalt roads, oil pipelines and main gas pipelines. Railway line,Crossing of water supply pipes, Samgori irrigation canal and asphalt roads Will be done by underground drilling. Underground crossings will be carried out by compression,Drilling in horizontal and oblique directions. Gravel paved roads The crossing will be done in an open manner of back filling, compaction and cover restoration With security. Intersection of gas and power lines Will be carried out at an angle of not less than 60 degrees.
According to the project, it is planned to arrange two construction sites, which Will be used for storage of building materials and construction Equipment stands are also planned for the welding stand and need