Share Price: 60.50Bid: 58.75Ask: 75.00Change: 1.375 (+2.33%)Riser - Victoria Oil
Spread: 16.25Spread as %: 27.66%Open: 58.25High: 60.50Low: 57.50Yesterday’s Close: 59.125


Share Discussion for Victoria Oil (VOG)


Thread ViewThread View
Please Login or Register to post messages
Posts per page:


Premium Membership
SpaceHoppa
Posts: 952
Off Topic
Opinion:No Opinion
Price:57.00
View Thread (2)
RE: spacehoppa
13 Jan '15
Sarge, I feel certain Vog will add another gas train should a contract with Dibamba be won, one for next year may be??? It will be interesting to know where Vog plant to drill from, & where to at some point, I hope it is the ''red blob'' !!
 
maisydaisy
Posts: 1,238
Off Topic
Opinion:No Opinion
Price:57.00
Altaquaa
13 Jan '15
Don't think these boys will take long - notice RENTAL not purchase

Benefits of hiring Altaaqa Global Cat Rental Power
•Altaaqa Global Cat Rental Power, with the strategic support of Caterpillar, provides a worldwide network with over 1,600 locations that can offer customers complete multi-megawatt temporary power solutions.
•The power generation industry’s largest – and most modern – rental power fleet. Altaaqa Global together with Caterpillar’s network of Cat dealers combine to offer full-line, single-sourced solutions for all rental power needs. All dealers are backed by factory rental professionals around the world, providing an extra level of support provided by Altaaqa Global Cat Rental Power and the Cat dealers worldwide.
•Reliable equipment, built exclusively for rental power industry. Temporary power modules are well engineered and packaged to withstand extreme climate – from the harshest heat conditions of the Middle East to the rugged cold mountains of North America and the wet tropical rains of Asia.
•Experienced engineers and service technicians, supported by the best parts availability in the world. Altaaqa Global and Caterpillar’s parts network provides local sourcing for most parts and routinely ships emergency orders within 4 hours of receiving the order. No other rental operation can boast of the worldwide dealer network and parts distribution system that Altaaqa Global customers have come to rely on.
•Turnkey service – around the clock, 7 days a week. Cat Rental Fleet and dealer Resource Centers provide expert consultation, additional rental inventories, and other resources to dealers and their customers worldwide. Altaaqa Global Cat Rental Power and Caterpillar’s network handles large-scale temporary power projects of almost unlimited size, from 20MW rental power plant to 250 MW distributed power generation or more.
•Altaaqa Global’s power rental fleet is built by the world’s largest manufacturer of medium-speed generator engines, Caterpillar diesels are the cleanest in the industry.
•Altaaqa Global’s natural gas and dual fuel is the cleanest solution in the power rental industry.
•Altaaqa Global’s strategic partnerships with key suppliers of power ancillary equipment such as power transformers, distribution equipment, etc. ensure matched, high-quality total solutions for any temporary power requirement.
sarge123
Posts: 1,716
Observation
Opinion:No Opinion
Price:57.00
View Thread (2)
spacehoppa
13 Jan '15
Going forward 20mmscf/d is fine given the processing capacity they currently have . They would need some amount of justification to build more processing but that may come along if the Dibamba power station gets the go ahead . Maybe if those other two wells go ahead then the processing would also be done at that location and it can feed in to another part of the network .
PottyTime
Posts: 4,319
Off Topic
Opinion:No Opinion
Price:57.00
Sp
13 Jan '15
Someone's Dragon 32 home computer is doing the business.
Time for Open All Hours and Nurse Gladys.
Gunner1
Posts: 3,391
Off Topic
Opinion:No Opinion
Price:57.00
some distinct
13 Jan '15
buying going on since 10.45 ish
SpaceHoppa
Posts: 952
Off Topic
Opinion:No Opinion
Price:57.00
View Thread (4)
RE: Who's going to be using fas fir..
13 Jan '15
t would be comforting to think that the Cameroun gov were that proactive & competent, but I have not see much evidence so far. Dangote will start production much sooner than power plants I feel.
Gunner1
Posts: 3,391
Off Topic
Opinion:No Opinion
Price:57.00
tides turning
13 Jan '15
this morning hopefully, maybe next leg up and news to follow or precede :-) GLA
maisydaisy
Posts: 1,238
Off Topic
Opinion:No Opinion
Price:57.00
View Thread (4)
RE: Who's going to be using fas fir..
13 Jan '15
You'd like to think that having imported gensets already, and the Gov being a stakeholder and energy being all important to Cam, that the genset installer would not have the problems GDC did when perhaps setting the earlier precedent. I assume same goes for Dangote and its own power production - believe that they have now started the cement production/raw materials in (courtesy of netuis from iii)

Business in Cameroon) - Built on the banks of the Wouri River by Nigerian billionaire, Aliko Dangote (for a total investment of 50 billion FCFA), the cement factory will enter production in January 2015 and will soon start selling cement on the Cameroonian market, affirms project chief, Baba Abduhallï.
The cement factory has already received its first shipments of raw materials, particularly clinker and gypsum as well as pozzolan from a quarry in the city of Tombel where Dangote Cement Cameroon has approval to use for 5 years.
SpaceHoppa
Posts: 952
Off Topic
Opinion:No Opinion
Price:57.00
View Thread (4)
RE: Who's going to be using fas fir..
13 Jan '15
Miss Maisy, getting the pipe to the power plants is not the problem, getting the generators through the dock yards will be the sticking point. Regarding the processing plant, it is capable of 40mmscf/day!! As is the well 104, but I do not think Vog want to go over 20mmscf/day without more back up from another gas train.
maisydaisy
Posts: 1,238
Off Topic
Opinion:No Opinion
Price:57.00
View Thread (4)
Who's going to be using fas first?
13 Jan '15
Dangote or a power station..MID Jan is not far away or go we need to add the KF Factor (of old?)

The Bassa Power Station is located 0.3km from our operating northern pipeline and the Logbaba Power Station is located 1.3km along the proposed eastern leg off our main line. The pipeline construction to Bassa has been completed to the power station boundaries and GDC has started pipeline construction towards the Logbaba power station, this work is scheduled to be completed by mid-January 2015





Sign up for Live Prices


Home  |  Contact Us  |  About Us  |  Careers  |  Advertise with Us  |  Sitemap  |  Terms & Conditions  |  Cookies  |  Privacy


Datafeed and UK data supplied by NBTrader and Digital Look. While London South East do their best to maintain the high quality of the information displayed on this site,
we cannot be held responsible for any loss due to incorrect information found here. All information is provided free of charge, 'as-is', and you use it at your own risk.
The contents of all 'Chat' messages should not be construed as advice and represent the opinions of the authors, not those of London South East Limited, or its affiliates.
London South East does not authorise or approve this content, and reserves the right to remove items at its discretion.